Energy Efficiency at Design Stage A Checklist for Saudi Commercial Building Owners

Energy efficiency starts with decisions made before a commercial building is constructed. Agree how the building will be used, then ask the design team to coordinate its façade, cooling, ventilation, lighting and controls. Compare options using consistent assumptions, and plan how performance will be checked after handover.

For Saudi building owners, this checklist provides questions and documents to request at each stage. It applies best to a new commercial project; a major renovation may also use relevant parts after its existing conditions and applicable requirements are assessed.

 

1. Define what energy performance means for your project

Start with an owner’s project requirements document. Describe the intended building use, occupancy, operating hours, comfort expectations and major equipment. An office with mostly daytime occupancy has different needs from a retail building operating late into the evening.

Ask the team to propose a measurable energy target and explain the baseline, assumptions and scope. One possible measure is energy use intensity: annual energy use divided by a defined floor area. Specify which energy sources and spaces are included so future comparisons are meaningful.

  • Identify who approves the target and who updates it as the design changes.
  • Record operational needs such as tenant hours, maintenance access and monitoring.
  • Decide whether a certification is a project objective and what evidence it would require.

2. Confirm the applicable Saudi requirements

Ask the appointed consultant to identify the code edition, relevant authority requirements and any project-specific standards before design options are finalised. The Saudi Building Code Center describes SBC 601 as the energy conservation code for nonresidential buildings, covering the envelope, HVAC, ventilation, lighting and other equipment.

Review the official SBC 601 information page with your consultant. Applicability, permitted compliance methods and documentation depend on the project and the requirements in force for it.

Request a responsibility matrix showing who prepares the compliance evidence and when it is reviewed. Keep minimum code compliance and any additional owner or certification targets visible as separate requirements.

3. Review the building envelope before selecting equipment

The building envelope is the roof, external walls, windows and other elements separating indoor and outdoor conditions. Ask the architect and engineer to assess orientation, shading, insulation, glazing and air leakage together. These choices influence solar heat entering the building as well as daylight, comfort and appearance.

Request façade options that show the effect of glazing area, glass performance and external shading on the whole building. For example, compare two proposed west-facing façades using the same occupancy and climate assumptions. A visually appealing option should also be assessed for glare, maintenance and its impact on cooling demand.

The building envelope is the roof, external walls, windows and other elements separating indoor and outdoor conditions. Ask the architect and engineer to assess orientation, shading, insulation, glazing and air leakage together. These choices influence solar heat entering the building as well as daylight, comfort and appearance.

Request façade options that show the effect of glazing area, glass performance and external shading on the whole building. For example, compare two proposed west-facing façades using the same occupancy and climate assumptions. A visually appealing option should also be assessed for glare, maintenance and its impact on cooling demand.

4. Challenge the HVAC design assumptions

Heating, ventilation and air conditioning (HVAC) needs depend on the building’s location, envelope, occupancy, equipment and required indoor conditions. Ask the mechanical engineer to explain the design weather data, operating schedules, ventilation assumptions and cooling-load calculations. CIBSE’s Saudi design guide identifies climate zones, building fabric and cooling-load calculations as relevant topics.

See the CIBSE design guide for Saudi Arabia for the guide’s scope; the engineer must apply the requirements appropriate to the project.

Compare system choices on more than the equipment’s advertised efficiency. Request an explanation of part-load performance, zoning, controls, maintenance requirements, water use where relevant, and space for replacement. Challenge unexplained sizing allowances: oversized equipment can affect operation, while inadequate capacity can compromise comfort.

Efficiency decisions must preserve the ventilation and indoor environmental conditions required for the building. Confirm the design approach with the project’s qualified mechanical engineer.

5. Coordinate lighting and controls

Ask the lighting designer to consider daylight and electric lighting together. Review efficient fittings, controls, zoning and the needs of different spaces. A meeting room with irregular use may benefit from a different control strategy than a reception area or a continuously occupied security desk.

Check who will set schedules and adjust controls after handover. Involve facilities staff in reviewing the proposed sequences, access to controls and override arrangements. An efficient specification is more useful when the people operating it understand how it works.

6. Compare options with transparent assumptions

An energy model estimates how a building may perform under stated conditions. Ask the modeller to document the weather file, occupancy, operating hours, equipment loads, system efficiencies and baseline. Compare alternatives using the same assumptions, and request a summary that makes the design trade-offs clear.

For each option, consider initial cost alongside expected energy use, maintenance, replacement and operating needs over an agreed period. Record the cost assumptions and uncertainty. Actual consumption and savings will depend on occupancy, weather, control settings and equipment performance; a model is not a guarantee of a future bill.

Set a point in the design programme for reviewing the findings before major façade and system choices are locked in. If a later substitution changes an important assumption, ask the team to assess its effect and update the decision record.

7. Plan metering, commissioning and handover

Decide what information the owner and facilities team will need after occupancy. A metering strategy may distinguish major systems or tenant areas where this is useful and feasible. Specify the data access, naming, reporting and responsibility for reviewing results rather than assuming that installing meters alone will improve performance.

Commissioning is the planned process of checking whether systems are installed and operate according to the project requirements. Agree its scope, roles, test procedures and timing in the design brief. Coordinate testing of controls and operating sequences with the contractors and the future building operator.

Before acceptance, request the agreed commissioning records, equipment schedules, control descriptions, as-built drawings, maintenance information and staff training. Identify unresolved issues and assign owners and dates for closing them. Plan a review after the building has been occupied and operating data is available.

Owner’s design-stage checklist

Use this table at design reviews to track the decision, the team involved and the evidence to request.

DecisionLead TeamEvidence to Request
Performance targetOwner and design teamTarget, baseline and operating assumptions
Façade and shadingArchitect and energy specialistOption comparison and envelope details
Cooling and ventilationMechanical engineerLoad assumptions and system comparison
Lighting and controlsLighting and electrical designersControl zones and operating sequences
Energy and costsEnergy specialist and cost adviserModel assumptions and cost comparison
Verification and operationCommissioning and facilities teamsTest plan, metering and handover schedule

Discuss energy efficiency early

Crown Axis provides sustainability and energy services in Saudi Arabia. To discuss your commercial building’s design objectives and coordination needs, contact the Crown Axis team.

Frequently asked questions

When should an owner involve an energy specialist?

Bring an energy specialist into the team during the project brief or concept stage, when orientation, façade and system choices can still be compared. Agree what the specialist will analyse and what decisions the analysis must support. Continued involvement can also help the team assess significant changes as the design develops.

Does an energy-efficient building need green building certification?

Not necessarily. Energy performance is a design and operational objective; a certification is a separate decision with its own criteria, evidence and costs. An owner may choose a certification for project or stakeholder reasons. Ask the consultant to explain the scope, responsibilities and any effect on the programme before committing.

How should owners compare options with different upfront costs?

Use a consistent assessment period and record the assumptions for purchase, installation, energy, maintenance and replacement. Include operational considerations such as access to servicing and the expected life of equipment. Compare the sensitivity of the result to uncertain inputs, and avoid treating a single estimated payback period as a guaranteed outcome.

Can an energy model predict the exact electricity bill?

No. An energy model produces an estimate based on assumptions about weather, occupancy, equipment and operating schedules. The eventual bill also depends on actual usage and applicable tariffs. Ask for the assumptions and scope so you can understand what the model includes, compare options consistently and interpret differences after occupancy.

What should the facilities team receive before opening?

Agree the handover package early. Depending on the contract, it can include as-built drawings, equipment schedules, controls documentation, commissioning results, maintenance instructions, warranties and training. The facilities team should know how to access meters, interpret alarms, adjust schedules and report unresolved defects, with responsibility for follow-up clearly assigned.

Can this checklist be used for a major renovation?

Yes, as a starting point, but the team should first assess the existing building, equipment, records and operating data. Practical choices may be constrained by the retained structure, occupied spaces or existing systems. Ask the consultant to confirm which requirements apply to the proposed work and to develop an appropriate assessment and commissioning scope.

Our Real World Work in Action

Browse through some of our proudest builds and transformations

Water Pressure Zoning and Booster Pumps: Decisions for Saudi Commercial Buildings

We prioritize attention to detail and use high-quality materials for lasting, exceptional results.

VRF or Chilled Water for a Saudi Office Building? A System Selection Framework

We prioritize attention to detail and use high-quality materials for lasting, exceptional results.